Hi All,
Im trying to use operation RE510 in a pcr to pull-in an amount per pay scale group, pay scale level and wage type. We have a specific combination of psg, psl, and wage type that has a new amount effective June 1st. This happens to be mid payperiod, so we need both old and new rates for evaluation. When I use RE510 it only brings in the newest rate.
Is it possible for this operation to consider any date logic (from table T510)?
Thanks,
Brandyn